Two electricians in civilian work clothes stand at an open industrial control cabinet marked DANGER 240 VOLTS, one reaching in toward the terminal blocks with a screwdriver while the other steadies the panel.
Field Notes

2026 NEC Changes: What's Law in Texas and North Dakota

September 29, 2026 · 8 min read · Rinvio Team

← All field notes

The 2026 National Electrical Code is the code you are working under in Texas, where the TDLR rule took effect September 1, 2026, and in North Dakota, where the State Electrical Board's standards took effect July 1, 2026. Most of the 2026 NEC changes that land on a commercial or industrial job are old rules with new numbers. Here is what moved, and what to check before the inspector walks the job.

2026 NEC adoption by state: Texas, North Dakota and who else is enforcing it

The Texas rule is 16 TAC 73.100. TDLR adopts the 2026 NEC "as approved by the National Fire Protection Association, Inc. on September 9, 2025," and the Texas Commission of Licensing and Regulation voted it through July 28, 2026.

The rule contains no transition sentence. Neither 73.100 nor the Texas Register preamble mentions permits already filed or work in progress, and Occupations Code 1305.201(d) subjects work inside city limits to local ordinances.

Call the city. Ask which edition they are holding your permit to, and get it in writing.

North Dakota's version is an 88-page book of laws, rules and wiring standards, effective July 1, 2026. James Schmidt, executive director of the North Dakota State Electrical Board, says "the committee approved our proposals as submitted and became law July 1, 2026."

One trap. In late September the board's own Laws and Rules web page still carried scope text naming the 2023 edition, several paragraphs below the link to the 2026 book. Open the PDF.

NFPA's enforcement map, current to August 3, 2026, lists six states on the 2026 NEC. Massachusetts took it April 24, 2026 and Maine on July 1, both with state amendments; North Dakota and Wyoming on July 1; Colorado on August 1; Minnesota on August 17, where filings before that date stay on the 2023 NEC, its Department of Labor and Industry says. The map still counts Texas among the 20 states on 2023, because it predates the Texas date. Count Texas and it is seven as of this writing. NFPA's table already projects Oregon for October 1, so re-read the map, not this sentence, before you travel.

Travel changes the answer. Wisconsin moved the same September 1 Texas did, and only to the 2023 NEC, with its own amendments in SPS 316. Commercial work there had been on the 2017 edition since 2018, so crossing that line takes you back a code cycle. "Once again, Wisconsin will skip over one code cycle and leapfrog over the 2020 NEC and into the 2023 NEC," says Mark Cook, electrical education specialist at Faith Technologies, in June in The Daily Reporter. If you hold licenses in two states, check license reciprocity.

The 2026 NEC changes that moved your section numbers

The new numbers come first. "Article 220, Branch-Circuit, Feeder, and Service Load Calculations, was reorganized and moved to Chapter 1 as new Article 120," says Dean Austin, senior electrical specialist at NFPA. Article 750, energy management systems, became Article 130, and 750 turns up again in Chapter 7 for grounding and bonding of limited-energy systems.

Medium-voltage work got its own articles in Chapter 2. Over 1000 volts ac and 1500 volts dc, overcurrent protection is Article 245, branch circuits 265, feeders 266, outside branch circuits and feeders 267, services 268, grounding and bonding 270. The requirements did not move much. The citations did, so submittals written off the old numbers point at dead sections.

Limited-energy material consolidated into new Chapter 7 articles 720 through 723, 742 and 750. Chapter 8 lost those requirements and lost its independence with them. It no longer stands alone. Code-Making Panel 1 voted to end it, and Kyle Krueger, NECA's executive director of codes and standards, says the vote is "one of the most significant structural updates to the NEC in more than 50 years."

Dwelling feeder and service load dropped from 3 VA to 2 VA per square foot in 120.41, while 120.13 keeps 3 VA for branch circuits. Section 120.5(E) takes the 125 percent continuous-load multiplier out of the load calculation. It does not change how you size a conductor or breaker for a continuous load. Section 120.7 lets a listed power control system into the calculation, so a service need not cover loads that never run at once.

What changed on GFCI, arc-flash labels and working space

GFCI expansion is what most people expect in a new edition. "For the first time in more than 30 years, the GFCI requirements in this Section were not expanded in any significant way," says Ryan Jackson, an NEC instructor who sits on Code-Making Panels 3 and 17, in EC&M.

210.8(F) did change. The outdoor-outlet threshold at dwellings went from 50 amps to 60 amps, which catches the larger units and the heat pumps the 50-amp line used to miss, and a new Exception No. 3 allows special purpose GFCI protection on listed HVAC equipment, with a warning label on the equipment disconnect wherever you use it. An SPGFCI "does not open until a differential current of more than 20mA is present," Jackson says, against 6mA for a Class A device. High-frequency tolerant GFCI-HF devices "are now available," Jackson says, but GFCI-HF+ devices "will not be unless UL 943 is revised."

Texas took its one deviation right here. Section 73.100(b) adopts 210.8(F) Exception No. 2, the one for listed HVAC equipment, "without expiration." NFPA's own version of that exception expired September 1, 2026, the day the Texas rule took effect. NEMA opposed it. Compatible devices "are now being manufactured and are hitting the marketplace," NEMA says in comments to TDLR. TDLR answered that compatible GFCI outlets "are not yet widely available and thus have not yet alleviated the risk of outages," and kept the carve-out. So the same condenser gets wired one way in Texas and another where the sunset took effect.

By Krueger's reading in Electrical Contractor Magazine, the 110.16 label in other than dwelling units has to list nominal system voltage, arc flash boundary, available incident energy or minimum PPE level, and the date of the assessment. Neither Krueger nor NFPA's summary prints an ampere threshold, and the secondary write-ups that do disagree with each other. Read 110.16 in the 2026 book before you order labels.

Section 110.26(C)(2) is the one to walk your gear room with. Each end of the working space still needs an entrance 24 inches wide and 6 1/2 feet high, on equipment rated 1,200 amps or more and over 6 feet wide. "The 2026 NEC expands this provision to apply to service and feeder disconnecting means," Krueger says. The path "must be measured accounting for the doors to be opened to the 90-degree position," Krueger says, even where doors are removable or swing further. So take the tape in at layout, with the gear doors open.

Three adult electrical apprentices wire a motor-control training board together at a workbench in a training-center classroom, with panelboards mounted on the wall behind them
Fourth-year IBEW electrical apprentices work on a motor-control training board in class, photographed January 28, 2005. Photo by MN AFL-CIO via Flickr, CC BY 2.0.

2026 NEC exams and continuing education in Texas and North Dakota

TDLR's candidate bulletin says in capital letters that effective September 1, 2026 the Texas examinations "will be referenced to the 2026 NEC." The exam is open book, and you bring your own soft-bound copy. Texas continuing education stays at 4 hours a renewal, tied to the NEC as adopted.

North Dakota is stricter on hours. NDAC 24.1-04-01-01 requires eight CE hours to renew, at least half on the 2026 edition, and its CE page sets the course changeover at July 1, 2026. The board teaches its own changes class 16 times in eight cities, Fargo among them, and tells you to bring a 2026 code book, because it sells none at the door.

Exams there are still catching up. In the July 2026 newsletter Schmidt says the board "will be implementing the new tests early this fall." Ask before you schedule.

One more if you charge anything that moves. New Article 624 covers power transfer systems for electric self-propelled vehicles not built for on-road use, which reaches scissor lifts and forklifts. North Dakota repealed its own EV charging rule on July 1, 2026 to defer to Article 625. For this cycle NFPA counted 3,933 public inputs, down from the 4,006 submitted for the 2023 edition.

Rinvio staffs traveling electricians on W-2 and lists open electrical jobs online.

Sources: Texas Register, Adopted Rules, Title 16, TDLR Electricians (16 TAC 73.100, TRD-202603409, filed August 12, 2026, effective September 1, 2026, 51 TexReg 5776), whose preamble carries the NEMA comment and TDLR's response quoted in the post, https://www.sos.state.tx.us/texreg/archive/August282026/Adopted%20Rules/16.ECONOMIC%20REGULATION.html, and the proposal text of March 20, 2026, https://www.sos.state.tx.us/texreg/archive/March202026/Proposed%20Rules/16.ECONOMIC%20REGULATION.html; TDLR Commission Meeting Agenda, July 28, 2026, https://www.tdlr.texas.gov/Agendas/Commagendas/agenda-2026-07-28.pdf; TDLR, Commission Adopts Rules, September 1, 2026, https://www.tdlr.texas.gov/news/rulemaking/2026/09/01/commission-adopts-rules-12/; Texas Occupations Code 1305.101 and 1305.201, https://texas.public.law/statutes/tex._occ._code_section_1305.201; TDLR Electrician Exam Information, https://www.tdlr.texas.gov/electricians/elecexam.htm, and the TDLR Electrician Candidate Information Bulletin (PSI), https://test-takers.psiexams.com/api/content/bulletin/1682; TDLR Electrician Continuing Education, https://www.tdlr.texas.gov/electricians/elecce.htm; North Dakota State Electrical Board, Laws, Rules, Wiring and Conveyance Standards of North Dakota, effective July 1, 2026 (NDAC Title 24.1, including 24.1-04-01-01, 24.1-04-01-02, 24.1-05-01-01 and 24.1-06-06-25), https://www.ndseb.com/image/cache/2026_Laws_Rules_Wiring_and_Conveyance_Standards.pdf; NDSEB Newsletter Issue 286, July 2026 (James Schmidt), https://www.ndseb.com/image/cache/Newsletter_286-_July_2026.pdf; NDSEB Continuing Education Approved Courses, https://www.ndseb.com/continuing-education/continuing-education-approved-courses/, NDSEB CEU Classes Registration, https://www.ndseb.com/continuing-education/ndseb-ceu-classes-registration/, and the NDSEB Laws and Rules page whose stale scope text is described in the post, https://www.ndseb.com/laws-rules/; NFPA, NEC enforcement maps (state table current to August 3, 2026), https://www.nfpa.org/education-and-research/electrical/nec-enforcement-maps; Dean Austin, NFPA, "What Changed in the 2026 NEC?", January 29, 2026, https://www.nfpa.org/news-blogs-and-articles/blogs/2026/01/29/2026-nec-key-changes; Ryan Jackson, "Key Revisions to Chapter 2 of the 2026 NEC," EC&M, September 15, 2026, https://www.ecmweb.com/national-electrical-code/code-basics/article/55400217/key-revisions-to-chapter-2-of-the-2026-nec; Kyle Krueger, "Building the Foundation: Key changes to articles 90-130 of the 2026 NEC," Electrical Contractor Magazine, January 15, 2026, https://www.ecmag.com/magazine/articles/article-detail/building-the-foundation--key-changes-to-articles-90-130-of-the-2026-nec; Thomas A. Domitrovich, "NEC 2026 Significant Code Changes," IAEI Magazine, July 1, 2025, https://iaeimagazine.org/standards/nec-2026-significant-code-changes/, used to corroborate the new Chapter 2 and Chapter 7 article numbers; Minnesota Department of Labor and Industry, Electrical codes and standards, https://www.dli.mn.gov/node/1926; Mark Cook quoted by Ethan Duran, "Wisconsin enacting new residential electrical codes in the fall," The Daily Reporter, June 10, 2026, https://dailyreporter.com/2026/06/10/wisconsin-enacting-new-residential-electrical-codes-in-the-fall/. Featured photo: U.S. Army photo by Trevor Welsh, U.S. Army Corps of Engineers, via DVIDS (public domain)

Ready When You Are

Your crew could be on site
in 24 hours or less.

See if your business qualifies for net terms. We front the crew, you pay later. We answer 24/7, and most quotes come back within 2 hours.