Open Role

Site Safety Professional (Data Center Construction)

Amarillo, TX | Full-Time W-2 | $49–$65 / hr

This is a Full-Time, W-2 Data Center position with Rinvio in Amarillo, TX, paying $49–$65 / hr.

Rinvio is hiring an experienced Construction Site Safety Professional for a long-term, multi-year data center construction project. You will run day-to-day safety on an active mission-critical site: daily walks and inspections, hazard identification, permits, incident response, toolbox talks, and coordination with the general contractor and trade partners. This is an hourly W-2 position with steady work for someone who knows large-site construction safety and can hold a standard without slowing the job down.

Requirements

  • 5+ years of construction safety experience on large commercial, industrial, or mission-critical projects
  • CHST, CSP, or ASP certification, or equivalent field safety experience with a path to certification
  • OSHA 30 required; OSHA 500 or 510 a plus
  • Able to walk large active sites daily and lead inspections, audits, and incident investigations
  • Degree in safety or a related field, or equivalent experience

Benefits

Weekly pay, plus medical, dental and vision plans available.

Rinvio is an equal opportunity employer. All qualified applicants are considered, including those with arrest or conviction records. Need an accommodation to apply or interview? Just ask.

Apply in 60 Seconds

Apply for this role

Resume

Required. Recruiters match you from your resume. Resume larger than 3MB? Email it to us instead.

A Rinvio recruiter will reach out, usually within one business day.

Need an accommodation to apply? Call (949) 216-4879 or email info@rinvio.com.

See open jobs